RFI: Replacement of Deteriorated Steel Process Cooling Water Pipe System

The proposed project is to replace the deteriorated steel process cooling water pipe system (facilities 71A, 71D, 20, and 20A) and served by cooling towers at facility 21624 (building 71D) with new steel and fiberglass reinforced pipe (FRP) piping. FRP piping shall be for direct bury applications and areas exposed to harsh environments, i.e. existing steam tunnels. Steel piping is preferred in all mechanical room spaces and where maintenance is easily accessed. Replacement of pumps, new Process Automation System controls which include new control valves, new VFDs, process automation system programming, new Motor Control Center MCC-71D, and associated Automatic Transfer Switch (ATS), conduit, and miscellaneous control components.
- Product Service Code: Z2JZ – REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
- NAICS Code: 236220 – Commercial and Institutional Building Construction
- Place of Performance: Dayton, OH USA
- Original Response Date: Oct 29, 2020, 02:00 pm EDT
Full details via beta.sam.gov
Check out our RESOURCES page for a sample letter that we use in response to government market research.
Leave a Reply